10 Steps to Your Own Home

Building Guide

A simple and clear guide that will help you understand all the steps from decision-making to living in your modular home.

Step 1

Decision to Build a House

You have decided to build your own house — congratulations!

  • Choosing a modular house — faster, more efficient, higher quality
  • What matters is not just the house model, but the entire process from start to finish
Land Plot 2

Step 2

Land Plot

Before you start, several essential questions about the land plot need to be clarified.

  • Whether you already have a land plot or plan to purchase one
  • Whether modular house delivery is possible — access for long trucks and crane access
  • Electricity connection — critically important
  • Water — connection to existing or possible well/borehole
  • Sewage — connection to existing or biological sewage system
Project 3

Step 3

Project

The project is developed and provides clear answers to essential questions.

  • House placement on the land plot
  • Water, electricity, and sewage solutions
  • Building possibilities and restrictions
  • The project is coordinated with building authorities and a building permit is obtained
  • The manufacturer can provide project development and coordination

Step 4

Starting Project Realization

The project is approved and the building permit is obtained — you can safely begin!

  • A contract is signed with Create House for modular house manufacturing
  • Practical work can safely begin

Step 5

Site Preparation

The land plot is prepared for construction work.

  • Deforestation if needed (cooperation partners available)
  • Site preparation for construction work
  • Access for heavy machinery must be provided
Parallel Work 6

Step 6

Parallel Work

Manufacturing and construction work happen simultaneously to avoid unnecessary waiting.

  • The manufacturer starts house production in the factory
  • The client builds the foundation (usually screw piles)
  • The client connects utilities to the house — centralized connections or well + biological sewage
Work happens in parallel to save time

Step 7

Landscaping

Can begin after utilities are connected.

  • House delivery needs must be considered
  • Crane access must remain clear
  • Landscaping planned so as not to interfere with installation
House Delivery & Installation 8

Step 8

House Delivery & Installation

The most exciting stage — your house arrives!

  • The house is delivered to the site
  • Installed on the prepared foundation
  • Connected to utilities
  • The house is ready for living

Step 9

Commissioning

The final formal steps before full-time living.

  • Building survey
  • Utility as-built measurements
  • Electrical installation measurements and load tests
  • Smoke detectors
  • Chimney sweep certificate (if there is a fireplace)
  • Commissioning at the building authority
  • The manufacturer can help with coordination
Living in Your Own Home 10

Step 10

Living in Your Own Home

The process is complete — welcome to your new home!

  • The house has been commissioned
  • You are living in your own home

Download the checklist

All 10 steps in a simple sequence with the ability to check off each completed stage. Possible assistance and coordination noted for each step.

Download PDF Guide
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 9
Step 10

Questions?

We Will Help at Every Step

If you have questions about any of the stages or want a consultation — contact us.